Project
The construction of the Grand Paris Express ring metro is one of the largest operations of public works in Europe with the boring of 200km of tunnels and construction of 68 stations in the greater Paris region. Most construction sites are located in densely populated areas and can be a source of severe disturbance for residents and local businesses.
To reduce these inconveniences, the client wanted to introduce a neighbourhood communication tool for construction work progress.
Challenge
Need: monitor noise levels.
Need: display real-time information about a worksite and advance notice for potentially disturbing operations
UBY solutions
Tri-dimensional sound sensors (called Méduse sensors because of their shape similar to a jelly-fish) have been installed on 31 worksites as of August 2021 and connected to the uMonitor platform, recording noise levels and locating its precise origin.
On the platform, the project team enters the expected sound levels for the 10 upcoming days according to the operations scheduled of the worksite.
A site-specific Worksite Forecast widget uCom displays the recorded sound level in real-time. Residents in the neighbourhood can see where the noise comes from on the images recorded by the embedded camera. The widget also displays the noise forecast for the next 10 days. Additionally, this communication channel is interactive, where the local community members can share their grievances with the project team directly.
Our references
- uCom
SGP: Grand Paris Express’ Neighbourhood Communication
- uCom